Cost Planning

  • Estimating through Conceptual, Schematic, Development, and Pre-Construction Design stages.
  • Feasibility Studies - Identifies whether or not a project is a good investment in terms of value and costs and establishes the rate of return on the investment.  The study also provides a means of persuading lenders and investors that the project is a sound investment.
  • Construction and Total Project Budgeting - provides a detailed cost breakdown of a specific project in either a trade or elemental format.  At schematic design stages, budgets can be established based on a cost per unit and / or cost per unit area based on prior project data of similar scope.
  • Cost Control - Proper Cost Control is critical with each and every project and would ensure that expenditures do not exceed the budget for each element of the project, proper Cost Control also obtains the desired project values / benefits at the least cost and avoids the risk of re-design or abandonment of a project that is significantly advanced.

 Contact Info.

Alberta Office:
31 Valley Creek Bay NW
Calgary, AB. T3B 5V3
Tel: (403) 441-9320
Fax: (403) 366-2911

Alberta@berniercostmanagement.com


Saskatchewan Office:
2511 Commerce Drive
North Battleford, SK. S9A 3W2
Tel: (306) 244-9320

Saskatchewan@berniercostmanagement.com